The work of Samrudhhi Mahamarg is on a fast track! – Part 2

The construction of Samrudhhi Mahamarg is going on in 16 sections. The section is named as ‘Construction Package’. To maintain the good speed of work and proper work management, a total of 16 construction packages are made, each having around 40 to 45 Kms. boundaries of Districts, Talukas, Villages coming within 700 Kms. Samrudhhi Mahamarg alignment, as well as many other factors, are considered while making the construction packages. Hence, the brief of how this construction work will take place and what are the updates of work given in those 16 packages will be conveyed through this series of blogs.

Details of Construction Package 4

Package 4 is from chainage Km. 162.667 to chainage Km. 217.023. This section is from Village Donad Budruk to Village Januna Khurd in District Washim and has a length of 54.356 Km. Construction work of this package is awarded to M/s. PNC Infratech Ltd. Along with road work, there are major structures to be constructed.

These are as follows:- â€Ļ

02 Interchanges and 05 Service Roads of a total length of 763 meters, 06 Flyovers/Viaducts of the total length of 2375 meters, 02 Major Bridges of the total length of 190 meters, 15 Minor Bridges

Details of Construction Package 5â€Ļâ€Ļ

Package 5 is from chainage Km. 217.023 to chainage Km. 259.900. This section is from Village Kinhiraja to Village Kenwad in District Washim and has a length of 42.877 Km. Construction work of this package is awarded to M/s. Sadbhav Engineering Ltd. Along with road work, there are major structures to be constructed.

These are as follows:- â€Ļ

01 Interchange and 06 Service Roads of a total length of 360 meters, 12 Flyovers/Viaducts of the total length of 3264.211 meters, 02 Major Bridges of the total length of 193.86 meters, 09 Minor Bridges

Details of Construction Package 6â€Ļâ€Ļ

Package 6 is from chainage Km. 259.900 to chainage Km. 296.000. This section is from Village Belgaon to Village Prada in District Buldhana and has a length of 36.100 Km. Construction work of this package is awarded to M/s. APCO Infratech Pvt. Ltd. Along with road work, there are major structures to be constructed.

These are as follows:- â€Ļ

01 Interchange, 01 Major Bridge of the total length of 454.688 meters, 14 Minor Bridges

Along with the above big structures, there are many small and medium structures that will be constructed in the highway work. The above-mentioned contractors have started the construction of the highway in their awarded packages. â€Ļ

Go to this link for more information.